Print Page   |   Contact Us   |   Your Cart   |   Sign In   |   JOIN NFSA
Site Search
Technical Tuesday-NFPA 13 Installation Criteria (2013 Ed.)
Tell a Friend About This EventTell a Friend
 

4/9/2013
When: April 9, 2013
10:30 AM Eastern


Online registration is closed.
« Go to Upcoming Event List  

April 9, 2013

NFPA 13 Installation Criteria, 2013 Edition – Intermediate – Karl Wiegand, E.I.T.

The new edition of NFPA 13 has brought about some significant changes to the installation requirements for sprinkler systems. These changes include allowable system sizes, the definition of a system, CPVC compatibility requirements, and many others. This presentation will cover all of the major changes to the installation requirements of NFPA 13, 2013 Edition including the changes to the hanging and bracing requirements.

 

 

 

more Event Calendar

12/13/2016 » 12/15/2016
Bellingham, WA

1/10/2017 » 1/12/2017
Ventura, CA

   

"To protect lives and property from fire through the widespread acceptance of the fire sprinkler concept"-NFSA Mission Statement

Quick Links

Home     Join    Sign In    Technical Help    SQ Magazine     NFSA TV

Contact Us

Phone: (845) 878-4200      Fax: (845) 878-4215      Email Us

MD Office - 514 Progress Drive  Suite A   Linthicum Heights, MD 21090
NY Office -  40 Jon Barrett Road   Patterson, NY  12563

Membership Software Powered by YourMembership  ::  Legal