Print Page   |   Contact Us   |   Your Cart   |   Sign In   |   JOIN NFSA
Site Search
Portland, OR
Tell a Friend About This EventTell a Friend
 

10/28-10/29/2014 Sprinkler System Plan Review 10/30/2014 Rough & Final Inspections for Sprinkler Systems

10/28/2014 to 10/30/2014
When: October 28-30, 2014
Where: Portland Fire & Rescue Station #2
4800 NE 122nd
Portland, Oregon  97230
United States


Online registration is closed.
« Go to Upcoming Event List  

October 28-29, 2014/2-Day Sprinkler System Plan Review
This two-day seminar provides attendees with vital information on how to conduct the plan review process for water-based fire protection systems.

Utilizing the requirements of NFPA 13 the participant will be guided through an actual review of sprinkler system plans and calculations. They will discuss the importance of employing a systematic review process and identify the documents required for a complete plan review. Finally they will review a submittal of hydraulic calculation presented with the plans and discuss the process of hydraulic calculations and identify the key pieces of information presented and the common errors that are made.

Total Instructional Contact Minutes: 780 min. (1.3 CEUs, 13 CPDs )

Learning Objectives:
At the conclusion of this seminar the participant will be able to:

1. Apply the requirements for Plan Review in NFPA 13
2. Discuss the importance of a systematic review process.
3. Identify the documents required for a complete plan review process
4. Correlate the requirements for plan review with the requirements in other chapters of NFPA 13.
5. Evaluate the hydraulic

For a complete syllabus, click HERE

Please bring a current copy of NFPA 13 with you.

REGISTRATION FEE: Members/AHJs: $225 Non-Members: $475

 

October 30, 2014/Rough & Final Inspections of Sprinkler Systems
This one day seminar provides attendees with vital information on how to conduct the field inspections for new fire sprinkler and standpipe systems.

Fire sprinklers and standpipes are installed in stages and inspections are required before commencing to the next stage. The codes require periodic on-site inspections as the work progresses, to be installed according to the approved construction documents. This work is required to be inspected and approved before being covered or before the system is commissioned. This course points out the visual and physical inspection requirements of the latest codes and standards.

Total Instructional Contact Minutes: 390 min. (.7 CEU)
Professional Approvals: AIA - Provider #: G131, Course #: NFSA08, 7 LU/HSW

Bring latest edition of NFPA 13, NFPA 14 and IBC or IFC to presentation. Bring materials for writing and taking notes.

For a complete syllabus, click HERE


REGISTRATION FEE: Members/AHJs: $110 Non-Members: $200

more Event Calendar

12/6/2016 » 12/8/2016
Tulsa, OK

12/13/2016 » 12/15/2016
Bellingham, WA

   

"To protect lives and property from fire through the widespread acceptance of the fire sprinkler concept"-NFSA Mission Statement

Quick Links

Home     Join    Sign In    Technical Help    SQ Magazine     NFSA TV

Contact Us

Phone: (845) 878-4200      Fax: (845) 878-4215      Email Us

MD Office - 514 Progress Drive  Suite A   Linthicum Heights, MD 21090
NY Office -  40 Jon Barrett Road   Patterson, NY  12563

Membership Software Powered by YourMembership  ::  Legal