INSURANCE AUTHORITIES

INSURANCE AUTHORITIES

ARTICLE ISSUE #

ISO's New Plan Review Stamp SQ 23

The Insurance Authority Having Jurisdiction - The Rules of the Game? SQ24

Bulletin From the Factory Mutual System SQ 24

ISO - Myths and Facts SQ 24

Kemper's HPR Department on Hydraulic Calculations SQ24

Factory Mutual System SQ 25

Industrial Risk Insurers SQ 26

Improved Risk Mutuals SQ27

Bulletin from IRI SQ 27

Asking Industrial Risk Insurers SQ 28

ISO Joins FM in Calling for Hydraulic Nameplates SQ 29

ISO Plan Review Procedures SQ 32

Two for the AHJ (Technically Speaking) SQ 42

Insurance Services Office Re-Evaluating Sprinklered Risks SQ 45

The ISO Main Drain Test SQ 45

ISO Consolidates Field Operations (Sprinkling of News) SQ 46


IRI

Mechanical Joint Retainer Glands - IRI Urges Caution TN I 2

Industrial Risk Insurers - Amendments to Interpretive TN I 3

Guide - NFPA 13

IRI Rules Out Wafer Check Valves... TN II 4

..And Prefers System Alarm Valves TN II 4

Dry Grids - What the Insurers Are Doing TN II 6

IRI Releases Interpretative Guide to NFPA 13 - 1978 TN II 6

Should We Call Them RGF's? TN III 1

It Won't Rust But... TN III 2

Anti-Flooding Device Causes Accelerator Failure TN III 4

Sprinkler Shields for Rack Sprinklers - How Long? TN III 1

IRI Clarifies Pump Sensing Line Policy TN IV 1

IRI Streamlines Computer Plan Review TN IV 5

Industrial Risk Insurers Appendix I For Hydraulically TN IV 5

Designed Sprinkler Systems

IRI: Steel Deck Tabs Not For Sprinkler Hangers TN V 1

IRI Interpretive Guides - What's Available? TN V 2

IRI Issues Interpretive Guide to NFPA 13 - 1983 TN VI 5

IRI Releases Interpretive Guide to NFPA 13-1985 TN VIII 3

IRI and WAUSAU Interpretive Guide Now Available TN VIII 4

Only Minor Changes In IRI Guide to NFPA 231-1985 TN VIII 5

IRI Releases Revised Guide to NFPA 13-1985 TN IX 4


ISO

Insurance Services Office Letter to Owners TN I 3

ISO Wants Out of Contracts TN I 3

Tobacco Warehouse Sprinkler Corrosion TN I 3

Room For Improvement TN I 4

ISO and The Two-Inch Drain Test TN I 5

Know Your ISO Office TN II 2

ISO's Lone Exception to NFPA 13 TN II 2

ISO No Longer Supplying Water Information TN II 3

Wisconsin ISO Overlooked TN II 4

ISO Plan Review Delays Explained TN II 6

Dry Grids - What the Insurers are Doing TN II 6

The Independents TN III 3

ISO Changes Policy on Orifice Mixing TN III 5

ISO Position on New Standards Acceptance TN IV 1

New ISO/CRS Field Offices TN VI 3

ISO Criteria for Composite Wood Joist Construction TN VI 6

FM/ISO Frown on Cross Mains at Peaks TN VII 2

ISO Files Revision 8 of Rating Schedule TN VIII 2

Where are the Earthquake Areas TN VIII 4

ISO Proposes Insurance Credit for NFPA 13R Systems TN XII 2

ISO Clarifies Its Wardrobe Policies TN XVIII 5



FM

Factory Mutual - Flushing Connections TN I 3

Factory Mutual - Large Drop Sprinklers TN I 3

FM Drops Out Soft Soap and Paint Remover for Sprinklers TN I 6

FM Still Doesn't Like Small Orifice Sprinklers TN I 6

Factory Mutual Updates to 1976 Pump Standard TN I 6

Factory Mutual Again Weighing Hydraulic Design TN II 3

FM Responds to Contractor Comments TN II 3

FM Will Not Use New Plastic Rules TN II 6

Dry Grids - What the Insurers Are Doing TN II 6

Factory Mutual Decides to Get Tough TN III 1

FM Limits Special Sprinklers to Light Hazard TN III 1

Sprinkler Shields for Rack Sprinklers - How Large? TN III 1

Factory Mutual Update - Limiting Flush, Recessed, and TN III 2

Concealed Sprinklers to Light Hazard

Factory Mutual Update - Nameplates TN III 2

Factory Mutual Update - Hydraulic Calculations TN III 2

Factory Mutual Update - Large Drop Sprinklers TN III 2

Factory Mutual Update - Sprinkler Performance Statistics TNIII 2

FM Asks for Designation of Fittings TN III 5

FM Considering Severe Pressure Limits TN III 6

FM Shares Advice, Cautions, Plans TN IV 1

FM Tests Show Extra Friction for Grooved Couplings TN IV 4

Major Changes in New FM Sprinkler Data Sheet TN V 2

Follow-Up on Gaskets, Fittings TN V 3

FM Data Sheet 2-8N Delayed TN V 3

FM Releases New Sprinkler Data Sheet TN V 5

FM Holds Firm on Velocity Limits (also items on welding, TN VI 1

PRVs, pump design curves, and polybutylene pipe)

FM To Sprinkler Industry: No Data Sheet Service TN VI 2

FM Compromising on Data Sheets TN VI 3

FM Opposes Dual System Detector Use TN VI 5

FM/ISO Frown on Cross Mains at Peaks TN VII 2

FM Requiring Galvanized for all Dry and Preaction Systems TN VIII 3

Where are the Earthquake Areas TN VIII 4

Avoiding Restrictions on Welded Outlets TN IX 1

FM Approves Threaded "XL" Thinwall TN IX 2

Factory Mutual Releases Draft ESFR Product Approval Standard TN IX 5

Factory Mutual Proposes Contractor Approval TN XI 4

FM Attempts to Clarify Approval Standard for Contractor Services TN XII 4

FM Urges Against Galvanized Pipe in Hot Areas TN XII 5

FM Revised Approval Standard For Plastic Pipe and Fittings TN XIII 1

FM Opens Door to Special Area/ Density Listings TN XVII 2


KEMPER

Kemper "Interpretive Guide" For Calculated Systems TN II 6

Kemper Guide to NFPA 13 TN XVI 2



GENERAL

The Independents TN III 3

Residential Sprinkler Insurance Credits TN V 3

Insurers React to Threaded Thinwall TN VI 2

The Large Drop Sprinkler/Extra Large Orifice Situation TN VI 4

Lumberman's Underwriting Alliance Shares Guidelines TN VI 4

Wausau Interpretive Guide TN VII 4